Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Structural Five story plan, Schemes and Mind Maps of Engineering Drawing and Graphics

Proposed Structural Five story plan

Typology: Schemes and Mind Maps

2023/2024

Uploaded on 10/08/2024

unknown user
unknown user 🇵🇭

2 documents

1 / 14

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe

Partial preview of the text

Download Structural Five story plan and more Schemes and Mind Maps Engineering Drawing and Graphics in PDF only on Docsity!

SITE DEVELOPMENT PLAN

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-

M G

H

WATER TANK

HOUSEGUARD

K^ L

C

O

9

OLD PS

GATE

N

R

I

SHED

ORCHIDARIUM

BENECO

POST

BENECO

POST

WATER TANK OLD BUILDING

STAIRS

P

TO BRGY. PHIL-AM

NORTH

F

L

Y

O

V

E

R

A

B

D

E

D

N

F

PP-7^ OP-

PP-4 PP-2 OP-

OP-

PROPOSED

FIVE-STOREY W/ 2-

BASEMENT DIAGNOSTIC

BUILDING

PP-5CPP-5B PP-5A

OP-

OP-

OP-3 OP-

OP-

PP-

MARCOS HIGHWAY

PP-3^ PP-5D

PP-

23

O PP-

OP- 1 ON-GOING INFRASTRUCTURE PROJECTS ( OP )

PROPOSED SIX (6)-STOREY TRAUMA CENTER BUILDING

OP- 2 (BRAIN, HEART, LUNG, KIDNEY) CENTER BUILDINGPROPOSED EIGHT (8)-STOREY MULTI-SPECIALTY

OP- PSYCHIATRIC COMPLEX BUILDINGPROPOSED FOUR (4)-STOREY W/ BASEMENT

OP- OUT-PATIENT DEPARTMENT BUILDINGPROPOSED & RENOVATION /EXPANSION OF

OP- MOLECULAR / PCR LABORATORY AND ISOLATION ROOMSPROPOSED TWO-STOREY W/ BASEMENT

OP- (BASEMENT AREA) FOR ISOLATION ROOMS FOR MERS COVPROPOSED RENOVATION OF I.D.B. BUILDING

OP- PROPOSED EXPANSION OF MOLECULAR LABORATORY BUILDING

OP- NUCLEAR MEDICINE DEPARTMENT

PP- 1 PROPOSED INFRASTRUCTURE PROJECTS ( PP )

DIAGNOSTIC LABORATORY BUILDINGPROPOSED FIVE - STOREY W/ TWO BASEMENT

PP-

PROPOSED NURSING WARD BUILDING

PP-

FOR THE HEMO-DIALYSISPROPOSED RENOVATION OF EXISTING DORMITORY BUILDING

PP-

MOTORPOOL & MAINTENANCE BUILDINGPROPOSED TWO (2)-STOREY W/ FOUR (4) BASEMENT

PP-

D. DIABETES CENTER BUILDINGC. EYE CENTER BUILDINGB. GERIATRIC CENTER BUILDINGA. PROPOSED NEW CANCER CENTER BUILDINGPROPOSED AREA FOR HOSPITAL EXPANSION (PUROK 1)

PP-

MULTI-LEVEL DORMITORY (INSTITUTIONAL HOUSING)PROPOSED RENOVATION OF EXISTING BANK HOUSE TO

PP-

PROPOSED EMERGING & RE-EMERGING DISEASE CENTER BUILDING

PP-

POWER SUB-STATION

PP-9OTHERS:

EMPC BUILDING- PROPOSED THREE (3)-STOREY W/ ROOF DECK

PP-

- PROPOSED AREA FOR MEDIUM - RISE HOUSING (FOR SEGREGATION)

CONCRETE MIXING AND PLACEMENT MATERIAL SPECIFICATIONS GENERAL NOTES^ CONSTRUCTION NOTES

NOTES ON REINFORCEMENT 600 600 600

400

400

A'

A

D

REBAR DIAMETER

D

HOOK LENGTH

HOOK LENGTH

NOTES ON SPLICES

600mm MINIMUM^ 40 BAR DIAMETER

NOTES ON CONCRETE HOLLOW BLOCKS NOTES ON COLUMNS

400 HOOK

400 HOOK

HOOK 400

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-

PART OF OPD BUILDING

1

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

5 000

8 550

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-

FOUNDATION PLAN

1

S SCALE 1:100MTS

FOUNDATION REINFORCEMENT SCHEDULE BOTTOM BARS

A'

B'

ADDITIONAL 25mmØ X 2,000MM IN BETWEEN CONT. TRANSVERSE BARS ADDITIONAL 25mmØ X 2,000MM IN BETWEEN LONGITUDINAL BARS

FOUNDATION REINFORCEMENT SCHEDULE

2

S SCALE NTS

A'

B' A'

B'

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

A'

B'

2 000

2 000

2 000

A'

B'

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A'

B'

2 000

2 000

A' B C C' D

2 3 4 5 6 7 8

7'

1'

4'

2 700 6 400 3 600 3 600 2 800

19 100

2 000 2 000 2 000 2 000

200 900

25 100

21 028

17 324 3 195

1 800

40 835

A

8

S

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

BASEMENT 2 FRAMING PLAN

1

S SCALE 1:100MTS

2 700 6 400 3 600 3 600 2 800

19 100

3 600

2 400

6 000

6 000

2 800

3 200

6 000

6 550

2 800

3 050

39 350

  • 50MM THK. GRAVEL BEDDINGS

PART OF OPD BUILDING

S-

A' B C C' D

1 2 3 4 5 6 7 8

7'

1'

4'

A

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-5b

GROUND FLOOR FRAMING PLAN

5b

1

S SCALE 1:100MTS

1 2 3 4 5 6 7 8

7'

1'

4'

3 600

2 400

6 000

6 000

2 800

3 200

6 000

6 550

2 800

3 050

39 350

  • 12MMØ BOTTOM BAR SPACED @ 125MM B.W. O.C.
  • 12MMØ TOP BAR SPACED @ 125MM CUT @ L/4 TO EACH ADJACENT SPAN

PART OF OPD BUILDING

  • 12MMØ BOTTOM BAR SPACED @ 125MM B.W. O.C.
  • 12MMØ TOP BAR SPACED @ 125MM CUT @ L/4 TO EACH ADJACENT SPAN

A'

2 700 6 400 3 600 3 600 2 800

19 100

A B C C' D

COREBELL (SEE DETAILS)

2 910

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

SECOND FLOOR FRAMING PLAN

5c

1

S SCALE 1:100MTS

S-5c

1 2 3 4 5 6 7 8

7'

1'

4'

3 600

2 400

6 000

6 000

2 800

3 200

6 000

6 550

2 800

3 050

39 350

  • 12MMØ BOTTOM BAR SPACED @ 125MM B.W. O.C.
  • 12MMØ TOP BAR SPACED @ 125MM CUT @ L/4 TO EACH ADJACENT SPAN

PART OF OPD BUILDING

  • 12MMØ BOTTOM BAR SPACED @ 125MM B.W. O.C.
  • 12MMØ TOP BAR SPACED @ 125MM CUT @ L/4 TO EACH ADJACENT SPAN

A'

2 700 6 400 3 600 3 600 2 800

19 100

A B C C' D

COREBELL (SEE DETAILS)

BEAM SCHEDULE

1

S

SCALE

NTS

10mmØ SPIRAL TIES SPA. @ 100mm 10-20mmØ VERT. BARS W/

600

6 000 (MINIMUM OR UNTIL REFUSAL)

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

1B-CB

Ø10:

1@50, 5@100, 5@200, REST @ 250

1B-CB2 1B-

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, 5@200, REST @ 250

1B-EB1 1B-TB21B-TB11B-091B-081B-071B-061B-051B-041B-031B-

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

CB-G02CB-G01 B-G

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

EB-GB1 B-GTB2B-GTB1 B-G03B-G

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø

B-G02A

Ø10:

1@50, 5@100, REST @ 250

B-G10B-G09B-G08B-G07B-G06B-G05B-G

Ø

CB-

Ø10:

1@50, 5@100, 5@200, REST @ 250

CB-202 B-

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, 5@200, REST @ 250

EB-201 B-2TB2B-2TB

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

B-209B-208B-207B-206B-205B-204B-203B-

MARK BEAM

WIDTH (B) (mm)

DEPTH (D) (mm)

R E I N F O R C E M E N T S

LEFT SUPPORT

(mm)^ BOTTOM

(mm) TOP^ RIGHT SUPPORT

(mm)^ BOTTOM

MID-SPAN (mm) TOP

BOTTOM (mm)

SECTION

ØBAR

(mm)TOP

STIRRUPS

Ø10:

1@50, REST @ 200

1B-

B-

Ø

Ø10:

1@50, 5@100, REST @ 250

Ø

Ø10:

1@50, 5@100, REST @ 250

CB-

Ø10:

1@50, 5@100, 5@200, REST @ 250

CB-302 B-

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, REST @ 250

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø10:

1@50, REST @ 200

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, 5@100, 5@200, REST @ 250

EB-301 B-3TB2B-3TB

Ø10:

1@50, 5@100, REST @ 250

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

B-310B-309B-308B-307B-306B-305B-304B-303B-

Ø

Ø10:

1@50, 5@100, REST @ 250

MARK BEAM

WIDTH (B) (mm)

DEPTH (D) (mm)

R E I N F O R C E M E N T S

LEFT SUPPORT

(mm)^ BOTTOM

(mm) TOP^ RIGHT SUPPORT

(mm)^ BOTTOM

MID-SPAN (mm) TOP

BOTTOM (mm)

SECTION

ØBAR

(mm)TOP

STIRRUPS

GROUND FLOOR FIRST BASEMENT^ SECOND BASEMENT

THIRD FLOOR SECOND FLOOR

0 600

0 450

10mmØ SPIRAL TIES SPA. @ 100mm 10-20mmØ VERT. BARS W/

S-

PILE REINFORCEMENT DETAILS

S (^3)

SCALE

1:50MTS

PILE SECTION DETAILS

2

S

SCALE

1:10MTS

2B-CB

Ø10:

1@50, REST @ 200

Ø10:

1@50, REST @ 200

Ø

Ø

2B-EB

A B A A B A A

MID-SPAN SPLICE 40d AT

SPLICE 32d AT COLUMN

OR SUPPORT

0.25L

L

L

L

D

D

D 0.25L

0.25L D

D 0.25L

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments of other contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

MARK SLAB

WIDTH (B)

(mm)

R E I N F O R C E M E N T S

BOTTOM BARS

TOP BARS

R E M A R K S

S-

Ø12 @ 125 EACH WAY

EACH ADJACENT SPANØ12 @125 CUT @ L/4 TO

CS

Ø12 @100 IN SHORT

DIRECTION Ø12 @150 IN

LONG DIRECTION

Ø12 @ 200mm EACH WAY

FLOOR SLABS

S-

Ø12 @ 150 EACH WAY

EACH ADJACENT SPANØ12 @50 CUT @ L/4 TO

SLAB ABOVE STAIRS

S-

Ø16 @ 150 EACH WAY

SLAB ABOVE ELEVATOR

Ø16 @ 150 EACH WAY

COLUMN SCHEDULE

1

S

SCALE

NTS

SLAB REINFORCEMENT SCHEDULE

2

S

SCALE

NTS

MARK SW

WIDTH (B)

(mm)

R E I N F O R C E M E N T S

VERTICAL BARS

HORIZONTAL BARS

R E M A R K S

SW-

Ø16 @ 150

SW-

PROVIDE 8 -Ø25 AT

ENDS

Ø16 @ 200

Ø16 @ 150

Ø16 @ 200

SW-

Ø16 @ 150

PROVIDE 4 -Ø25 AT

CORNERS

Ø16 @ 200

PROVIDE 4 -Ø25 AT

ENDS

SHEAR WALL SCHEDULE

3

S

SCALE

NTS

THK=1.20MMFY=418 MPARIB TYPE STEEL DECK COMPOSITE DECK

L

L/

L/

L

L/4 L/

@ 125MM O.C. B.W. 12MMØ RSB BOTTOM BARS SPA.SPA. @ 125MM BARS WITH STANDARD HOOK PROVIDE Ø12MM ADDITIONAL TOPFRAMINGREINFORCED CONCRETECOMPOSITE DECK ON @ 125MM O.C. B.W. LONGITUDINAL BARS SPA. 12MMØ RSB BOTTOM

SPA. @ 125MM BARS WITH STANDARD HOOK PROVIDE Ø12MM ADDITIONAL TOP

12MMØ RSB BOTTOM

TRANSVERSE BARS SPA. @ 125MM O.C. B.W.

BEAM

S-

CANTILEVER SLAB

3 SETS Ø10 : 2@50, 5@100, REST@

2 SETS Ø10 : 2@50, 5@100, REST@

3 SETS Ø10 : 2@50, 5@100, REST@

3 SETS Ø10: 2@50, REST@

600

600

FOUNDATION TO GROUND FLR

24 - Ø

600

GROUND TO 3RD FLOOR 600

20 - Ø

600

600

4TH TO ROOF

20 - Ø

FOUNDATION TO GROUND FLR

24 - Ø

600

600

600

600

16 - Ø

GROUND TO 3RD FLOOR

600

600

16 - Ø

4TH TO ROOF

3 SETS Ø10 : 2@50, 5@100, REST@

600

600

18 - Ø

FOUNDATION TO 3RD FLOOR

600

600

18 - Ø

4TH TO ROOF

3 SETS Ø10 : 2@50, 5@100, REST@

400

400 12 - Ø

FOUNDATION TO 3RD FLOOR

400

400

12 - Ø

4TH TO ROOF

400

400

8 - Ø

FOUNDATION TO 3RD FLOOR

400

8 - Ø20 400

4TH TO ROOF

400

400 10 - Ø

BSMT 2 TO RAMP

600

200 8 - Ø

3 SETS Ø10: 2@50, REST@200 BSMT 2 TO 5TH FLOOR

SLAB ON DECK TYPICAL DETAILS

4

S

SCALE

NTS

BASEMENT 1 FFL^ GROUND FFL SECOND FFL^ THIRD FFL FOURTH FFL FIFTH FFL ROOFDECK FFL

4 000 4 000 4 000 4 000 4 000 4 000 4 000 1 000

ELEVATOR SHAFT ROOF SLAB

2 000

TOP OF ELEVATOR FOOTING TOP OF MAT FOOTING

SCALE ELEVATOR SHAFT SECTION

1: ELEVATOR SHAFT DETAIL

S 2

SCALE

VERIFY

SCALE ELEVATOR FTG. BOTTOM REINFORCEMENT DETAILS

1:100MTS

900 MM THK SLAB

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-

75MM O.C. 12MMØ RSB SPACED @ 3-20MMØ RSB

250 250

3-20MMØ RSB

SPACED AT 200MM O.C.4-20MMØ RSB WITH 10MMØ TIES

600 RC COLUMN (C2)

6 000

600

FFL

250

BOLT 4- 16MMØ X 200MM

4- 16MMØ X 200MM BOLT RC COLUMN (C2)

600 VERIFY 250 250 VERIFY 4- 16MMØ X 200MM BOLT I-BEAM

600

6 000

600

I-BEAM

COREBELL SECTION DETAILS

1

S

SCALE

1:100MTS

BEAM SCHEDULE SECTION 1 SECTION 3 SECTION 2

250

250

SPACED AT 200MM OC10MMØ STIRRUPS

2-20MMØ RSB 2-20MMØ RSB

1:20 MTS

BASEMENT 2 FFL

0 900

8 550

5 000

25MMØ BTM BAR @150MM O.C.25MMØ BTM BAR @125MM O.C.

900 MM THK SLAB

8 550

5 000

25MMØ TOP BAR @200MM O.C.25MMØ TOP BAR @250MM O.C.

SCALE ELEVATOR FTG. TOP REINFORCEMENT DETAILS

1:100MTS

0 900 1 000 1 000

BOTTOM OF ELEVATOR FOOTING

FFL

4 000

2 000 2 000

LANDING FFL FFL

SPACED @ 300MM O.C.12MMØ TRANSVERSE TOP BAR 16MMØ TOP BAR SPACED @ 200MM O.C. 12MMØ AT NOSING

12MMØ TRANSVERSE BOTTOM BAR SPACED @ 300MM O.C. SPACED @ 200MM O.C. 16MMØ BOTTOM BAR

TYPICAL STAIRS REINFORCEMENT DETAIL

S

SCALE

1:100MTS

12MMØ SPACED @ 300MM O.C.

500

1 500

125

12MMØ RSB SPACED AT 125 O.C.12MMØ RSB SPACED AT 200 O.C. 12MMØ RSB SPACED AT 100 O.C. 12MMØ RSB SPACED AT 200 O.C.

6-25MMØ RSB 2-20MMØ RSB 6-25MMØ RSB 1@50MM, 5@100MM, REST@250MM10MMØ STIRRUPS SPACED:

RAMP DETAILS

3

S

SCALE

VERIFY

SECTION 2 (b-b)

1:50MTS

300

182

1 200 MAX

515

450

B

C

D

C'

0 900 VERIFY 0 450

2 026

8 574

3 575

BSMT 2 FFL

10MMØ STIRRUPS SPACED:

1@50MM, 5@100MM, REST@250MM

6-20MMØ RSB MID BAR^ 6-25MMØ RSB TOP BAR

6-25MMØ RSB TOP BAR

SECTION 1

1:100MTS

MAT FOOTING^ RC COLUMN

b-b

500 800

9 000

5 450

900

RETAINING WALL SECTION ELEVATION

S

SCALE

1:50MTS

150 O.C. UP TO 4500MM 28MMØ RSB SPACED @ 150 O.C. UP TO 4500MM 25MMØ RSB SPACED @ @ 200MM O.C. 2-20MMØ RSB SPACED 150 O.C. UP TO 9000MM 25MMØ RSB SPACED @ 150 O.C. UP TO 9000MM 20MMØ RSB SPACED @ 2-25MMØ RSB

BUILDING LINE

BSMT 2 FFL BSMT 1 FFL^ GROUND FLOOR FFL

450

RC GUTTER WITH COVER

SHEET NO.

APPROVED

Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33 Drawings and specifications and author of said documents.the written consent of the architect orexecuted partly or in whole, withoutprojects or buildings, whetheruse in the repetition of and for otheror make copies of said documents forunlawful for any person to duplicatemade is executed or not. It shall bewhether the object for which they areand documents of the architect,service, are the intellectual propertystamped or sealed, as instruments ofother contract documents duly signed, RA 9266 SECTION 33

CONCURRED

RECOMMENDING APPROVAL

PROJECT TITLE

LOCATION

AS SHOWN

DIAGNOSTIC BUILDING PHASE I^ PROPOSED FIVE - STOREY W/ 2-BASEMENT

Cordillera Administrative Region^ BGHMC Compound, Baguio City

SHEET CONTENTS

NOTED

RECARDO B. RUNEZ, MD, FPCS, MHA, CESE

Medical Center Chief II

Baguio General Hospital & Medical Center

LARRY C. HAYA JR., MD

Baguio General Hospital & Medical CenterOIC, Chief of Medical Professional Staff

VILMA O. MOLTIO, MPA

Chief Administrative Officer, HOPSS

Baguio General Hospital & Medical Center

RICHIE RHEY R. DIRIGE, CE

Engineer IV, Head EFMO - HOPSS

Baguio General Hospital & Medical Center

JOSELITO F. BUHANGIN, PhD.

STRUCTURAL ENGINEER

BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER REPUBLIC OF THE PHILIPPINES DEPARTMENT OF HEALTH BAGUIO CITY

CORDILLERA ADMINISTRATIVE REGION

S-

B-G03 (SEE BEAM SCHEDULE)

450

575

1-1/2" X 1-1/2" X

(^4) " 1

1" XANGLE BAR (^16) " FLAT BAR 3

1" X 1" X(SPACED @ 30MM)

(^16) " ANGLE BAR 3

1" X (^16) " FLAT BAR ( 3

1-1/2" X 1-1/2" XSPACED @ 30MM)

(^4) " 1

ANGLE BAR

(^800500)

9 000

5 450

900

DRAINAGE GUTTER SECTION

S

SCALE

1:50MTS

BUILDING LINE

BSMT 2 FFL BSMT 1 FFL^ GROUND FLOOR FFL

575

W/ APPROPRIATE ARRANGEMENT PROVIDE SHEAR 12 MM Ø SHEAR BARNOTE:* PROVIDE MESH & GRAVEL @ INLET* STAGGERED PLACEMENTHORIZONTAL SPACING: 1500 MM VERTICAL SPACING: 1000 MM 75 MM Ø WEEP HOLE

PIPE SHEAR BAR

CATCH BASIN W/ COVER ROAD PAVEMENT

SLOPE

12" STORM RCP

VARIES (600 MM MIN) 500

SLOPE

VARIES (600MM MIN)

700500

100180

500

576

10 S^ 4a

500

500

SECTION 4a

CATCH BASIN COVER

RC GUTTER W/ COVER DETAILS

S

SCALE

1:25MTS

CATCH BASIN WITH COVER DETAILS

S

SCALE

1:25MTS

350

@ 200MM O.C. E.W. 10MMØ RSB SPACED

SPA. @ 200mm O.C. B.W.^ REINFORCEMENT = 10mmØTHICKNESS = 100 MM^ RC WALL/SLAB^ 12" STORM RCPCATCH BASIN COVER

SPA. @ 200mm O.C. B.W. REINFORCEMENT = 10mmØTHICKNESS = 100 MM RC WALL/SLAB

1-1/2"x1-1/2"x

(^4) " 1

1"x ANGLE BAR (^16) " FLAT BAR 3 SPACED @ 30mm

1 000

RC GUTTER W/ COVER

1 000

BEAM (SEE SCHEDULE)

1B-G03 (SEE BEAM SCHEDULE)

MAT FOOTING (SEE DETAILS)