Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Exam Preparation: Capacity Planning, Facility Location, Quality Control, and Project Manag, Exams of Nursing

An exam preparation material covering key topics in operations management, including capacity planning, facility location, quality control, and project management. Detailed questions and precise answers for each topic, indicating that it is likely intended as a study guide or review material for an exam. The comprehensive coverage of these fundamental operations management concepts suggests that this document could be a valuable resource for university students enrolled in courses related to operations, supply chain, or industrial engineering. The level of detail and the focus on exam preparation make this document most suitable for university-level students, particularly those pursuing degrees in business, engineering, or related fields. By studying this document, students can gain a deeper understanding of these critical operations management principles and be better prepared to apply them in real-world scenarios.

Typology: Exams

2023/2024

Available from 08/13/2024

clevelsky
clevelsky 🇺🇸

22 documents

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
UKY AN 300 EXAM 2 2024/2025 WITH
100% ACCURATE SOLUTIONS
*Module 5: Capacity Planning* - Precise Answer ✔✔*Module 5:
Capacity Planning*
1) The maximum output that can be achieved by a facility is
-Lead time
-Storage space
-Productivity
-Cycle counting
-Capacity - Precise Answer ✔✔Capacity
2) An example of an output measure of capacity is
-Labor hours
-Number of machine centers
-Number of cars per shift
-Number of forklifts
-Floor space - Precise Answer ✔✔Number of cars per shift
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download Exam Preparation: Capacity Planning, Facility Location, Quality Control, and Project Manag and more Exams Nursing in PDF only on Docsity!

UKY AN 300 EXAM 2 2024/2025 WITH

100% ACCURATE SOLUTIONS

Module 5: Capacity Planning - Precise Answer ✔✔Module 5: Capacity Planning

  1. The maximum output that can be achieved by a facility is -Lead time -Storage space -Productivity -Cycle counting -Capacity - Precise Answer ✔✔Capacity
  2. An example of an output measure of capacity is -Labor hours -Number of machine centers -Number of cars per shift -Number of forklifts -Floor space - Precise Answer ✔✔Number of cars per shift
  1. The ratio of actual output rate to capacity is -Productivity -Utilization -Throughput -Effectiveness -Cycle time - Precise Answer ✔✔Utilization
  2. Economies of scale occur when a company is operating -At its best operating level and increases its output -At its best operating level and decreases its output -Below its best operating level and increases its output -Below its best operating level and decreases its output -Above its best operating level and increases its output - Precise Answer ✔✔Below its best operating level and increases its output
  3. Solving a decision tree that involves maximizing profit includes -Calculating from left to right Inverting decision nodes -Calculating expected values for all chance events before considering decision nodes -Using probabilities to calculate expected values for decision points
  1. Which of the following is a location alternative evaluation method? Check all that apply. -Transportation method -Critical path method -Break-even analysis -Decision tree -enter-of-gravity method -Control chart - Precise Answer ✔✔-Transportation method -Break-even analysis -Center-of-gravity method
  2. An excellent procedure that can be used with location factors that are qualitative is -The center of gravity approach -The factor rating method -The transportation method -The load-distance method -Break-even analysis - Precise Answer ✔✔The factor rating method
  3. For a break-even analysis, the total cost for each possible location is plotted against

-Variable costs -Profit margin -Fixed costs -Quantity -Price - Precise Answer ✔✔Quantity Module 7: Quality Control - Precise Answer ✔✔Module 7: Quality Control

  1. What measures the difference between the largest and smallest observations in a set of data? -Coefficient of kurtosis -Range -Standard deviation -Coefficient of skewness -Coefficient of variation - Precise Answer ✔✔Range
  2. What are the two types of control charts for variables? -p and R -x-bar and p -R and c
  • 1 - Precise Answer ✔✔> Module 8: Project Management - Precise Answer ✔✔Module 8: Project Management

  1. Which of the following is not characteristic of a project? -To be completed in a specified time period -Activities have defined precedence relationships -Has a specific objective -Has multiple activities -Typically performed by external consultants - Precise Answer ✔✔Typically performed by external consultants
  2. Actions that consume resources and/or time are project -Tasks -Activities -Arrows -Events -Nodes - Precise Answer ✔✔Activities
  1. The critical path is the sequential path of interrelated activities which has the -Most arrows -Most nodes -Longest time -Most events -Most activities - Precise Answer ✔✔Longest time
  2. The sum of the activity times on the critical path determines -Minimum time to complete the project -Total labor time required for the project -The number of milestones -Amounting of crashing that needs to be done -Total slack variable - Precise Answer ✔✔Minimum time to complete the project
  3. In making a forward pass through a network, 3 activities are immediate predecessors for activity T. What is the early start time for activity T? -The largest EF for the 3 activities that are immediate predecessors for activity T