civil engineer document, Cheat Sheet of Civil Engineering

civil engineering document for practical

Typology: Cheat Sheet

2022/2023

Uploaded on 02/03/2024

oryza-sativa-2
oryza-sativa-2 🇮🇩

3 documents

1 / 547

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Rekap BOQ Page 1 of 547
###
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN
PPK : 1.5 PROVINSI JAWA JAWA TIMUR
Prop/Kab/Kodya : PROVINSI JAWA TIMUR
Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1PEMELIHARAAN RUTIN KONDISI 1,680,088,305.19
2PENUNJANGAN/HOLDING 3,363,729,679.45
3PENANGANAN LONGSORAN 8,064,318,419.49
4PEMELIHARAAN BERKALA JEMBATAN 206,744,842.14
5REHABILITASI JEMBATAN 1,967,400,062.89
6PENANGANAN DRAINASE 1,827,787,173.48
A Jumlah Harga Pekerjaan Konstruksi+ PPN 17,110,068,482.63
BDibulatkan : 17,110,068,000.00
Terbilang : Tujuh Belas Miliar Seratus Sepuluh Juta Enam Puluh Delapan Ribu Rupiah
Semarapura, 30 Desember 2020
PT. ADITYA SINAR PRATAMA
(PUTU ADITYA PRATAMA MAHARDIKA,ST)
Direktur Utama
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44
pf45
pf46
pf47
pf48
pf49
pf4a
pf4b
pf4c
pf4d
pf4e
pf4f
pf50
pf51
pf52
pf53
pf54
pf55
pf56
pf57
pf58
pf59
pf5a
pf5b
pf5c
pf5d
pf5e
pf5f
pf60
pf61
pf62
pf63
pf64

Partial preview of the text

Download civil engineer document and more Cheat Sheet Civil Engineering in PDF only on Docsity!

Rekap BOQ Page 1 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

1 PEMELIHARAAN RUTIN KONDISI 1,680,088,305.

(^2) PENUNJANGAN/HOLDING 3,363,729,679.

3 PENANGANAN LONGSORAN 8,064,318,419.

(^4) PEMELIHARAAN BERKALA JEMBATAN 206,744,842.

5 REHABILITASI JEMBATAN 1,967,400,062.

(^6) PENANGANAN DRAINASE 1,827,787,173.

A Jumlah Harga Pekerjaan Konstruksi+ PPN 17,110,068,482.

B Dibulatkan : 17,110,068,000.

Terbilang : Tujuh Belas Miliar Seratus Sepuluh Juta Enam Puluh Delapan Ribu Rupiah

Semarapura, 30 Desember 2020

PT. ADITYA SINAR PRATAMA

(PUTU ADITYA PRATAMA MAHARDIKA,ST)

Direktur Utama

Ringkasan Target Panjang dan Total Harga

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

No Lingkup Pekerjaan Panjang Total Harga Bobot

KM

1 PEMELIHARAAN RUTIN KONDISI 26.41 Km 1,680,088,305.19 9.

2 PENUNJANGAN/HOLDING 23.85 Km^ 3,363,729,679.45 19.

3 PENANGANAN LONGSORAN 0.75 Km^ 8,064,318,419.49 47.

4 PEMELIHARAAN BERKALA JEMBATAN 69,9 m^ 206,744,842.14 1.

5 REHABILITASI JEMBATAN 37 m^ 1,967,400,062.89 11.

6 PENANGANAN DRAINASE 3.15 Km^ 1,827,787,173.48 10.

Jumlah 17,110,068,482.63 100.

Semarapura, 20 Desember 2016

PT. SINARBALI BINAKARYA

Direktur Utama

DAFTAR KUANTITAS DAN HARGA

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Uraian Satuan

PRESERVASI PEMELIHARAAN RUTIN JALAN PRESERVASI JEMBATAN

PEMELIHARAAN RUTIN KONDISI PENUNJANGAN/HOLDING PENANGANAN LONGSORAN REHABILITASI JEMBATAN PENANGANAN DRAINASE

Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) a b c d e f q r q r t u t u h i d v (^) HPS

DIVISI 1. UMUM 1.2 Mobilisasi 1.2 Mobilisasi LS 180,110,000.00 - - - - - 1.00 180,110,000.00 1.00 180,110,000.00 ###

    • - 1.8.(1) Manajemen dan Keselamatan Lalu Lintas - - - - - - 1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 63,900,000.00 - - - - - 1.00 63,900,000.00 1.00 **63,900,000.00 ###
  • -** - - - 1.17 Pengamanan Lingkungan Hidup LS 38,500,000.00 - - - - - - 1.17.(1a) Pengujian pH Buah 300,000.00 - - - - - 3.00 900,000.00 3.00 900,000.00 ### 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 300,000.00 - - - - - 3.00 900,000.00 3.00 900,000.00 ### 1.17.(2c) Pengajuan Parameter Kebisingan dan/atau Getaran Lainya Buah 3,000,000.00 - - - - - 3.00 9,000,000.00 3.00 9,000,000.00 ### 1.17.(3h) Pengujian Parameter Udara dan Ambien lainya Buah 3,000,000.00 - - - - - 3.00 9,000,000.00 3.00 9,000,000.00 ###
  • - 1.19 Kesehatan dan Keselamatan Kerja - - - - - - 1.19 Kesehatan dan Keselamatan Kerja LS 108,170,000.00 - - - - - 1.00 108,170,000.00 1.00 108,170,000.00 ###
  • - 1.20 Pengujian Tanah - - - - - 1.20.1 Pengeboran, Termasuk SPT dan Laporan M 750,000.00 - - 80.00 60,000,000.00 - - - 80.00 60,000,000.
  • - 1.21 Manajemen Mutu - - - - - - - - 1.21 Manajemen Mutu LS 87,000,000.00 - - - - - 1.00 87,000,000.00 1.00 87,000,000.00 ###

DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 22,197.49 - - - - - 2,840.83 63,059,295.52 2,840.83 63,059,295.52 ### 2.2.(1) Pasangan Batu dengan Mortar 516,130.75 - - - - - 1,198.26 618,458,830.13 1,198.26 618,458,830.13 ### 2.3.18 Gorong - Gorong Kotak Beton Bertulang, Ukuran dalam 150 cm x 150 cm 5,710,361.56 - - - - - 13.00 74,234,700.23 13.00 74,234,700.23 ### 2.3.(28) Saluran berbentuk U Tipe DS 4 832,926.66 - - 430.00 358,158,465.42 - - - 430.00 358,158,465. 2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) 254,518.78 - - 170.65 43,433,629.91 - - - 170.65 43,433,629.

  • **-
    • 401,592,095.32 - - 755,752,825.88 1,157,344,921.**

DIVISI 3. PEKERJAAN TANAH - -

3.1.(1) Galian Biasa 22,515.39 - - 1,024.69 23,071,294.98 5.44 122,483.72 1,798.75 40,499,557.76 68.25 1,536,675.37 2,897.13 65,230,011.83 ### 3.1.4 Galian Struktur dengan kedalaman 0 - 2 meter 69,421.55 - - - - - 29.25 2,030,580.34 29.25 2,030,580.34 ### 3.1.7 Galian Perkerasan Beraspal dengan Cold Milling Machine 247,202.98 - - - 10.87 2,687,096.43 60.76 15,020,053.28 - 71.63 17,707,149.71 ### 3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine 227,958.41 - 118.75 27,070,061.17 - - - 1.20 273,550.09 119.95 27,343,611.26 ### 3.1.9 Galian Perkerasan berbutir 42,484.80 - - - - - 48.00 2,039,270.16 48.00 2,039,270.16 ### 3.2.(1a) Timbunan Biasa dari Sumber Galian 160,147.66 - - - - 1,260.00 201,786,051.60 6.50 1,040,959.79 1,266.50 202,827,011.39 ### 3.2.(2a) Timbunan Pilihan dari Sumber Galian 284,475.95 - - 70.62 20,089,691.59 - - 56.45 16,058,667.38 127.07 36,148,358. 3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) 264,979.44 - - 12.10 3,206,251.26 - - - 12.10 3,206,251.

  • **-
  • 27,070,061.17 46,367,237.83 2,809,580.15 257,305,662.64 22,979,703.13 356,532,244.**

Total Volume

Total Harga

No. Mata (Rupiah)

Pembayaran

Harga Satuan

(Rupiah)

PRESERVASI REKONTRUKSI,

REHABILITASI JALAN

PENANGANAN DRAINASE,

TROTOAR DAN FASILITAS

KESELAMATAN JALAN

PEMELIHARAAN BERKALA

JEMBATAN

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M^3

M^3

M^1

M^1

M^3

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M^3

M^3

M^3

M^3

M^3

M^3

M^3

M^3

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Uraian Satuan

PRESERVASI PEMELIHARAAN RUTIN JALAN PRESERVASI JEMBATAN

PEMELIHARAAN RUTIN KONDISI PENUNJANGAN/HOLDING PENANGANAN LONGSORAN REHABILITASI JEMBATAN PENANGANAN DRAINASE

Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)

Total Volume

Total Harga

Pembayaran^ No. Mata^ Harga Satuan (Rupiah)^ (Rupiah)

PRESERVASI REKONTRUKSI,

REHABILITASI JALAN

PENANGANAN DRAINASE,

TROTOAR DAN FASILITAS

KESELAMATAN JALAN

PEMELIHARAAN BERKALA

JEMBATAN

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN - -

5.1.(1) Lapis Pondasi Agregat Kelas A 393,162.56 - - 5,107.54 2,008,093,478.56 20.44 8,036,242.63 48.75 19,166,674.58 72.00 28,307,703.99 5,248.73 2,063,604,099.76 ###

  • **-
    • 2,008,093,478.56 8,036,242.63 19,166,674.58 28,307,703.99 2,063,604,099.**

DIVISI 6. PERKERASAN ASPAL - -

6.1.(1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 11,149.34 - - 100.63 1,121,957.64 - - 312.00 3,478,592.69 412.63 4,600,550.33 ### 6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 10,919.26 - 2,375.00 25,933,242.50 281.75 3,076,501.51 95.06 1,037,984.86 274.33 2,995,480.60 36.00 393,093.36 3,062.14 33,436,302.82 ### 6.3.5a Laston Lapis Aus (AC-WC) Ton 1,071,080.51 - 275.50 295,082,681.42 96.28 103,123,631.82 25.20 26,991,228.94 72.74 77,910,396.54 22.27 23,855,105.19 491.99 526,963,043.91 ### 6.3.6a Laston Lapis Antara (AC-BC) Ton 1,053,435.82 - - 101.50 106,923,735.62 - 19.49 20,531,464.11 33.41 35,195,290.71 154.40 162,650,490. 6.3.(8) Bahan anti pengelupasan Kg 55,000.00 - - - 4.62 254,100.00 19.53 1,074,150.00 10.19 560,450.00 34.34 1,888,700.

  • **-
  • 321,015,923.92 214,245,826.59 28,283,313.79 102,511,491.25 63,482,531.96 729,539,087.**

DIVISI 7. STRUKTUR - -

7.1(5a) 1,916,988.45 - - 407.44 781,057,773.85 - 20.00 38,339,768.99 103.42 198,254,945.44 530.86 1,017,652,488. 7.1(7)a Beton struktur, Fc' 20 Mpa 1,130,130.27 - - 160.57 181,465,017.35 20.44 23,099,862.71 30.00 33,903,908.08 10.68 12,069,791.28 221.69 250,538,579.41 ### 7.1(10) Beton, Fc'10 Mpa 829,453.58 - - 4.67 3,873,548.21 - - 2.41 1,998,983.13 7.08 5,872,531.34 ### 7.3 (1) Baja Tulangan Polos - BjTP 280 Kg 14,502.40 - - 9,842.50 142,739,872.00 - - 6,423.20 93,151,815.68 16,265.70 235,891,687. 7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 14,502.40 - - 46,077.61 668,235,931.26 - - - 46,077.61 668,235,931.26 ### 7.3 (3) Baja Tulangan Sirip - BjTS 420A Kg 15,451.70 - - - - 1,442.31 22,286,141.43 - 1,442.31 22,286,141.43 ### 7.6 (1) (^) Fondasi Cerucuk, Pengadaan dan Pemancangan Cerucuk 71,342.86 - - - - - 198.00 14,125,885.71 198.00 14,125,885.71 ### 7.6.19b (^) Tiang Bor Beton diameter 300 mm 929,017.32 - - 1,515.00 1,407,461,239.18 - - - 1,515.00 1,407,461,239. 7.9.(1) (^) Pasangan Batu 617,876.58 - - 2,086.47 1,289,180,956.47 103.24 63,789,578.54 1,143.96 706,826,097.17 19.10 11,801,442.76 3,352.77 2,071,598,074.95 ### 7.15 (1) (^) Pembongkaran Pasangan Batu 104,423.71 - - - 3.05 318,492.32 8.50 887,601.55 - 11.55 1,206,093.87 ### 7.15 (2) (^) Pembongkaran Beton 399,485.67 - - - - 8.00 3,195,885.38 1.80 719,074.21 9.80 3,914,959.59 ###

      • (^) - **-
    • 4,474,014,338.33 87,207,933.57 805,439,402.60 332,121,938.21 5,698,783,612.**

DIVISI 8. REHABILITASI JEMBATAN - -

8.2.1 Penambahan (Patching) M3 3,815,523.31 - - - - 24.60 93,861,873.43 - 24.60 93,861,873.43 ### 8.2.2 (^) Perbaikan dengan cara Graut M3 20,997,900.00 - - - - 12.50 262,473,750.00 - 12.50 262,473,750.00 ### 8.4.4 (^) Perkuatan struktur dengan bahan FRP jenis carbon per lapis pada daerah kering 1,986,344.43 - (^) - - - 88.00 174,798,310.08 - (^) 88.00 174,798,310. 8.5.6a Pengencangan Baut Biasa Grade A diameter M25 Buah 42,648.57 - - - 185.00 7,889,985.71 - - 185.00 7,889,985.71 ### 8.7.1a Pengecatan struktur baja pada daerah kering tebal 80 mikron 52,077.14 - - - 352.88 18,376,982.17 - - 352.88 18,376,982.17 ### 8.11.1 Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug 1,363,541.67 - - - 14.00 19,089,583.33 29.60 40,360,833.33 - 43.60 59,450,416.67 ### 8.13.2 Perbaikan Sandaran Beton-Baja 629,200.00 - - - 6.00 3,775,200.00 - - 6.00 3,775,200.

              • **-
      • 49,131,751.22 571,494,766.84 - 620,626,518.**

M^3

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Beton Struktur fc’=30 Mpa M^3 M^3 M^3

M^1

M^1

M^3

M^3

M^3

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M^2

M^2

M^1

M^1

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Rekap BOQ Page 7 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA PEMELIHARAAN RUTIN KONDISI

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Panjang Jalan : 26.41 Km

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

< I > PEKERJAAN KONSTRUKSI

1 Umum -

2 Drainase -

3 Pekerjaan Tanah -

4 Pekerjaan Preventif -

5 Pekerasan Berbutir dan Perkerasan Beton Semen -

6 Perkerasan Aspal -

7 Struktur -

8 Preservasi Jembatan -

9 Pekerjaan Harian dan Pekerjaan Lain-Lain -

10 Pekerjaan Pemeliharaan Rutin -

10 Pekerjaan Layanan Pemeliharaan Rutin Jalan -

10 Pemeliharaan Kinerja Jalan 1,527,353,004.

SKH.1.10.b Pemeliharaan Kinerja Jembatan -

A 1,527,353,004.

B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 152,735,300.

C Jumlah Total Harga Pekerjaan = (A) + (B) 1,680,088,305.

Semarapura, 30 Desember 2020

PT. SINARBALI BINAKARYA

( Ir.Wayan Mahardika)

Direktur Utama

Jumlah Harga Pekerjaan Konstruksi ( termasuk Biaya Umum dan Keuntungan )

BOQ Page 8 of 547

DAFTAR KUANTITAS DAN HARGA

PEMELIHARAAN RUTIN KONDISI

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 26.41 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

No. Mata Uraian Satuan Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)

DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA -

10.1.1 Galian pada Saluran Air atau Lereng untuk pemeliharaan M3 264.00 57,288.80 15,124,243. 10.1.3 Perbaikan Pasangan batu dengan Mortar M3 118.80 516,130.75 61,316,333. 10.1.6 Perbaikan Lapis Pondasi Agregat Kelas S M3 246.00 459,370.18 113,005,064. 10.1.9 Perbaikan Campuran Aspal Panas M3 520.00 2,153,715.19 1,119,931,899. 10.1.16 Perbaikan Pasangan Batu M2 209.00 247,150.63 51,654,482. 10.1.21 Pembersihan Drainase M 13,205.00 4,024.22 53,139,820. 10.1.22 Pengendalian Tanaman M2 78,791.30 1,436.47 113,181,161.

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,527,353,004.

BOQ Page 10 of 547

DAFTAR KUANTITAS DAN HARGA

PENUNJANGAN/HOLDING

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 23.85 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

No. Mata Uraian Satuan Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)

DIVISI 3. PEKERJAAN TANAH

3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 118.75 227,958.41 27,070,061.

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 27,070,061.

DIVISI 6. PERKERASAN ASPAL

6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 2,375.00 10,919.26 25,933,242. 6.3.5a Laston Lapis Aus (AC-WC) Ton 275.50 1,071,080.51 295,082,681.

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 321,015,923.

DIVISI 10 PEKERJAAN PEMELIHARAAN KINERJA - -

10.1.3 Perbaikan Pasangan batu dengan Mortar M3 264.60 516,130.75 136,568,196. 10.1.6 Perbaikan Lapis Pondasi Agregat Kelas S M3 357.00 459,370.18 163,995,154. 10.1.9 Perbaikan Campuran Aspal Panas M3 1,095.00 2,153,715.19 2,358,318,133. 10.1.16 Perbaikan Pasangan Batu M2 99.84 247,150.63 24,675,519. 10.1.18 Perbaikan Rel Pengaman Buah 150.00 148,502.27 22,275,340. 10.1.19 Pembersihan Patok Buah 239.00 11,393.20 2,722,975. 10.1.20 Pembersihan Rambu Buah 119.00 10,880.40 1,294,767.

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,709,850,087.

Rekap BOQ Page 11 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA PENANGANAN LONGSORAN

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Panjang Jalan : 0.75 Km

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

1 Umum 60,000,000.

2 Drainase 401,592,095.

3 Pekerjaan Tanah 46,367,237.

4 Pekerjaan Preventif -

5 Pekerasan Berbutir dan Perkerasan Beton Semen 2,008,093,478.

6 Perkerasan Aspal 214,245,826.

7 Struktur 4,474,014,338.

8 Preservasi Jembatan -

9 Pekerjaan Harian dan Pekerjaan Lain-Lain 126,885,586.

10 Pekerjaan Pemeliharaan Rutin -

10 Pekerjaan Layanan Pemeliharaan Rutin Jalan -

10 Pemeliharaan Kinerja Jalan -

SKH.1.10.b Pemeliharaan Kinerja Jembatan -

A 7,331,198,563.

B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 733,119,856.

C Jumlah Total Harga Pekerjaan = (A) + (B) 8,064,318,419.

Semarapura, 30 Desember 2020

PT. SINARBALI BINAKARYA

( Ir.Wayan Mahardika)

Direktur Utama

Jumlah Harga Pekerjaan Konstruksi ( termasuk Biaya Umum dan Keuntungan )

BOQ Page 13 of 547

No. Mata Uraian^ Satuan^ Perkiraan Harga Jumlah

Pembayaran Kuantitas Satuan Harga-Harga

(Rupiah) (Rupiah)

DIVISI 7. STRUKTUR -

7.1(5a) Beton Struktur fc’=30 Mpa M3 407.44 1,916,988.45 781,057,773.

7.1(7)a Beton struktur, Fc' 20 Mpa M3 160.57 1,130,130.27 181,465,017.

7.1(10) Beton, Fc'10 Mpa M3 4.67 829,453.58 3,873,548.

7.3 (1) Baja Tulangan Polos - BjTP 280 Kg 9,842.50 14,502.40 142,739,872.

7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 46,077.61 14,502.40 668,235,931.

7.6.19b Tiang Bor Beton diameter 300 mm M1 1,515.00 929,017.32 1,407,461,239.

7.9.(1) Pasangan Batu M3 2,086.47 617,876.58 1,289,180,956.

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 4,474,014,338.33 0

DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN -

9.2.5 Patok Pengarah Buah 15.00 363,512.88 5,452,693.

9.2.7 Rel Pengaman M1 115.00 1,055,938.20 121,432,893.

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 126,885,586.

Rekap BOQ Page 14 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA PEMELIHARAAN BERKALA JEMBATAN

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Panjang Jalan : 69,9 m

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

1 Umum -

2 Drainase -

3 Pekerjaan Tanah 2,809,580.

4 Pekerjaan Preventif -

5 Pekerasan Berbutir dan Perkerasan Beton Semen 8,036,242.

6 Perkerasan Aspal 28,283,313.

7 Struktur 87,207,933.

8 Preservasi Jembatan 49,131,751.

9 Pekerjaan Harian dan Pekerjaan Lain-Lain 12,481,035.

10 Pemeliharaan Kinerja Jalan -

10 Pemeliharaan Kinerja Jembatan -

A 187,949,856.

B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 18,794,985.

C Jumlah Total Harga Pekerjaan = (A) + (B) 206,744,842.

Semarapura, 30 Desember 2020

PT. SINARBALI BINAKARYA

( Ir.Wayan Mahardika)

Direktur Utama

Jumlah Harga Pekerjaan Konstruksi ( termasuk Biaya Umum dan Keuntungan )

Rekap BOQ Page 16 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA REHABILITASI JEMBATAN

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Panjang Jalan : 37 m

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

1 Umum -

2 Drainase -

3 Pekerjaan Tanah 257,305,662.

4 Pekerjaan Preventif -

5 Pekerasan Berbutir dan Perkerasan Beton Semen 19,166,674.

6 Perkerasan Aspal 102,511,491.

7 Struktur 805,439,402.

8 Preservasi Jembatan 571,494,766.

9 Pekerjaan Harian dan Pekerjaan Lain-Lain 32,627,513.

10 Pemeliharaan Kinerja Jalan -

A 1,788,545,511.

B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 178,854,551.

C Jumlah Total Harga Pekerjaan = (A) + (B) 1,967,400,062.

Semarapura, 30 Desember 2020

PT. SINARBALI BINAKARYA

( Ir.Wayan Mahardika)

Direktur Utama

Jumlah Harga Pekerjaan Konstruksi ( termasuk Biaya Umum dan Keuntungan )

BOQ Page 17 of 547

DAFTAR KUANTITAS DAN HARGA REHABILITASI JEMBATAN Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 37 m Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

No. Mata Uraian^ Satuan^ Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)

DIVISI 3. PEKERJAAN TANAH

3.1.(1) Galian Biasa M3 1,798.75 22,515.39 40,499,557. 3.1.7 Galian Perkerasan Beraspal dengan Cold Milling Machine M3 60.76 247,202.98 15,020,053. 3.2.(1a) Timbunan Biasa dari Sumber Galian M3 1,260.00 160,147.66 201,786,051.

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 257,305,662.

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

5.1.(1) Lapis Pondasi Agregat Kelas A M3 48.75 393,162.56 19,166,674.

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 19,166,674.

DIVISI 6. PERKERASAN ASPAL

6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 274.33 10,919.26 2,995,480. 6.3.5a Laston Lapis Aus (AC-WC) Ton 72.74 1,071,080.51 77,910,396. 6.3.6a Laston Lapis Antara (AC-BC) Ton 19.49 1,053,435.82 20,531,464. 6.3.(8) Bahan anti pengelupasan Kg 19.53 55,000.00 1,074,150.

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 102,511,491.

DIVISI 7. STRUKTUR - -

7.1(5a) Beton Struktur fc’=30 Mpa M3 20.00 1,916,988.45 38,339,768. 7.1(7)a Beton struktur, Fc' 20 Mpa M3 30.00 1,130,130.27 33,903,908. 7.3 (3) Baja Tulangan Sirip - BjTS 420A Kg 1,442.31 15,451.70 22,286,141. 7.9.(1) Pasangan Batu M3 1,143.96 617,876.58 706,826,097. 7.15 (1) Pembongkaran Pasangan Batu M3 8.50 104,423.71 887,601. 7.15 (2) Pembongkaran Beton M3 8.00 399,485.67 3,195,885.

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 805,439,402.60 0

Rekap BOQ Page 19 of 547

REKAPITULASI DAFTAR KUANTITAS DAN HARGA PENANGANAN DRAINASE

Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN

PPK : 1.5 PROVINSI JAWA JAWA TIMUR

Panjang Jalan : 3.15 Km

Prop/Kab/Kodya : PROVINSI JAWA TIMUR

Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

Jumlah Harga

No. Divisi Uraian Pekerjaan

(Rupiah)

1 Umum 458,980,000.

2 Drainase 755,752,825.

3 Pekerjaan Tanah 22,979,703.

4 Pekerjaan Preventif -

5 Pekerasan Berbutir dan Perkerasan Beton Semen 28,307,703.

6 Perkerasan Aspal 63,482,531.

7 Struktur 332,121,938.

8 Preservasi Jembatan -

9 Pekerjaan Harian dan Pekerjaan Lain-Lain -

10 Pemeliharaan Kinerja Jalan -

A 1,661,624,703.

B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 166,162,470.

C Jumlah Total Harga Pekerjaan = (A) + (B) 1,827,787,173.

Semarapura, 30 Desember 2020

PT. SINARBALI BINAKARYA

( Ir.Wayan Mahardika)

Direktur Utama

Jumlah Harga Pekerjaan Konstruksi ( termasuk Biaya Umum dan Keuntungan )

BOQ Page 20 of 547

DAFTAR KUANTITAS DAN HARGA PENANGANAN DRAINASE Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 3.15 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN

No. Mata Uraian^ Satuan^ Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)

DIVISI 1. UMUM

1.2 Mobilisasi 1.2 Mobilisasi LS 1.00 180,110,000.00 180,110,000.

1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 63,900,000.00 63,900,000.

1.17 Pengamanan Lingkungan Hidup LS - - 1.17.(1a) Pengujian pH Buah 3.00 300,000.00 900,000. 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 300,000.00 900,000. 1.17.(2c) Pengajuan Parameter Kebisingan dan/atau Getaran Lainya Buah 3.00 3,000,000.00 9,000,000. 1.17.(3h) Pengujian Parameter Udara dan Ambien lainya Buah 3.00 3,000,000.00 9,000,000.

1.19 Kesehatan dan Keselamatan Kerja 1.19 Kesehatan dan Keselamatan Kerja LS 1.00 108,170,000.00 108,170,000.

1.21 Manajemen Mutu 1.21 Manajemen Mutu LS 1.00 87,000,000.00 87,000,000.

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 458,980,000.

DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 2,840.83 22,197.49 63,059,295. 2.2.(1) Pasangan Batu dengan Mortar M3 1,198.26 516,130.75 618,458,830. 2.3.15 Gorong - Gorong Kotak Beton Bertulang, Ukuran dalam 150 cm x 150 cm M1 13.00 5,710,361.56 74,234,700.

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 755,752,825.

DIVISI 3. PEKERJAAN TANAH

3.1.(1) Galian Biasa M3 68.25 22,515.39 1,536,675. 3.1.4 Galian Struktur dengan kedalaman 0 - 2 meter M3 29.25 69,421.55 2,030,580. 3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 1.20 227,958.41 273,550. 3.1.9 Galian Perkerasan berbutir M3 48.00 42,484.80 2,039,270. 3.2.(1a) Timbunan Biasa dari Sumber Galian M3 6.50 160,147.66 1,040,959. 3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 56.45 284,475.95 16,058,667.

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 22,979,703.

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN

5.1.(1) Lapis Pondasi Agregat Kelas A M3 72.00 393,162.56 28,307,703.

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 28,307,703.