
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Chiller Plant Sequence of Operation using Variable Frequency Drive Pumps
Typology: Summaries
1 / 1
This page cannot be seen from the preview
Don't miss anything!
Chiller Plant Manager (CPM) (^) Sequence of operation (^) (Primary VFD-Pumping) Contractor shall provide from the Approved Chiller Manufacturer to Supply & Install the (^) Chiller Plant Manager (CPM), and all the related Controls & Instrumentation works (^) and, Calibrate, Test & Commission the CPM to Monitor & Control
1.^ the Chiller Sequence of Operation based on Optimized Energy Saving Routines as follows: The^ GENERAL DESCRIPTION: (^) Chiller Plant Manager (CPM) (^) shall control and monitor all parameters related to Chillers & Pumps as per the measurements The actual value of Differential Pressure (DP) Set-Point to control the VFD Pumps shall be based on field signal to increase the VFD Pump Speed to maintain the target DP Set-point. when the terminal control valves close in response to decreased coil loads, the CPM shall decrease the control set-point across the system, the CPM shall increase the control signal to increase the VFD Pump Speed. Conversely, terminals (air-handlers or fan-coils) two-way control valves open in response to increased loads. To restore the DP MEP contractor and to be approved by the Consultant). The pressure difference tends to decrease when the (DP) Sensor, which shall be located at 2/3 of the secondary index circuit (DP final location to be coordinated by the The VFD Pumps should be controlled by a fully BACnet compatible VFD Control Panel, via the Differential Pressure^ 7.^ Primary Pump Speed Control: higher than the minimum required volume for the chillers. · (^) By-pass water and return water will mix and the volume of the total water returned to the chiller shall be always water goes back to the return header. set-point, the system controller opens the by-pass control valve so that a certain minimum volume of the supply Chiller evaporator due to low load condition and pump speed reduced to minimum set (VFD) to maintain the DP · (^) If the chilled water flow rate required on the Building load side becomes lower than the minimum limit of the^ 6.^ Minimum water flow through chillers · (^) Reverse will happen while Building load and, chilled Water demand increases. · (^) The system controller reduces the VFD Pumps Speed to maintain the Differential Pressure (DP) set point. · (^) While the 2-way valves close, the Differential Pressure (DP) will start rising. demand. · (^) As the building load decreases, the 2-way valve on AHU & FCU starts closing due to a reduction of chilled water^ 5.^ Chiller Plant Loading Unloading: compatible and shall communicate all I/P data & loading status to the CPM. should be increased or decreased. The Factory-Built Chiller Control Panel (CCP) of each Chiller shall be fully BACnet The CPM shall monitor & calculate the actual system demand to determine when the number of enabled Chillers^ 4.^ Chillers Auto Operation Mode: will operate manually, based on the Operators' decision. In the Manual Mode, the Operator can override the Chiller Sequencing and all equipment related to the Chiller Plant^ 3.^ Chillers Manual Operation Mode: conditions minimum flow (As per Chiller Manufacturer's requirements) across the online (running) Chillers during low load · (^) Provide a modulating valve on the bypass line between common Supply & Return Headers to maintain the Pressure & Flow throughout the secondary circuit by maintaining the proper Speed of VFD Pumps. · (^) Provide Differential Pressure (DP) Transmitter at a location 2/3 of secondary index circuit to maintain the desired Dedicated Flow Meter on the Common-Return Header, to measure the total system flow · (^) Provide immersion-type Temperature Sensors on the common Chilled Water Supply & Return lines. Provide a connecting the Supply and Return Headers, with the following controls. The chilled water-piping layout consists of common chilled water Supply-Header, Return-Header, and a By-Pass Line^ 2.^ PRIMARY CHILLED WATER CIRCUIT: · (^) VFD-PRIMARY PUMPS: Quantity as per Drawings and Specifications. · (^) AIR-COOLED CHILLERS: Quantity as per Drawings and Specifications. The chilled water generation system for the Project comprises the following Main Equipment: changes to ensure the Optimal & Safe Operation of the Chiller Plant. drawings & following control Sequence and, submit for Consultants' review & approval, of all the recommended Chiller Manufacturers' Requirements & Recommendations. The Chiller Manufacturers Rep. shall review the (^) taken (^) during Commissioning (^) & (^) Water-Balancing. (^) Using (^) an (^) estimated (^) setting (^) may (^) lead (^) to The bypass line control valve is modulated to maintain the minimum chiller flow. bypass. The CPM recognizes the operating Chillers and calculates the minimum flow rate for the running chillers. The bypass line control valve is controlled by a signal from the flow meter installed at the return pipe after the^ 8.^ BY-PASS VALVE CONTROL: return pipes > and the DP Set-Point. All Operating Pumps shall run at the same speed. required speed of VFD Pumps, based on the deviation between the Actual DP across chilled water supply and excess vibration may be encountered. When the pumps are in operation the PD Control Loop shall calculate the The minimum recommended pump speed is 30%, this is because VFD efficiency falls away rapidly below 25% and unnecessary pumping and energy loss. (^) This must be done slowly. Fast
OTHER SEQUENCES AND INTERLOCKS