Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
An examination paper from the cork institute of technology for the automation systems module (manu8002) in the bachelor of science (honours) in advanced manufacturing technology, bachelor of science (honours) in process plant technology programmes. Instructions, duration, sitting, requirements, and questions for the exam. Questions cover topics such as i/o bus networks, distributed control in fieldbus networks, human-machine interface design, scada interface architecture, cost analysis of automation systems, and ladder diagram programming for an automatic sorter.
Typology: Exams
1 / 4
This page cannot be seen from the preview
Don't miss anything!
Semester 1 Examinations 2011/
Module Code: MANU
School: Mechanical, Electrical & Process Engineering
Programme Title: Bachelor of Science (Honours) in Advanced Manufacturing Technology Bachelor of Science (Honours) in Process Plant Technology
Programme Code: EAMTE_8_Y EAMTN_8_Y EPPTN_8_Y
External Examiner(s): Mr Kevin McCarthy, Mr Ger Reilly Internal Examiner(s): Mr Michael Murray
Instructions: Answer Question ONE and TWO other questions.
Duration: 2 HOURS
Sitting: Autumn 2012
Requirements for this examination:
Note to Candidates: Please check the Programme Title and the Module Title to ensure that you have received the correct examination paper. If in doubt please contact an Invigilator.
Q1. (a) Draw a block diagram of an I/O bus network and describe FIVE advantages of I/O Bus networks [10 marks]
(b) Describe how distributed control is implemented in the Fieldbus network. [10 marks]
(c) Describe the factors that should be taken into account when designing a human-machine interface. [10 marks]
(d) Describe the architecture of a SCADA Interface. [10 marks]
(e) A production team has designed a system to automate an assembly operation. The associated hardware costs are as follows:
i. Pick and place robot €105,
ii. Vision system €7,
iii. Cameras €1,
iv. Associated hardware €7,
v. Fixtures €45,
It is estimated that maintenance will cost approximately €1,500 per month. Training will cost approximately €12,000.
The new system will free up FOUR employees at an average cost of €27,000 per employee.
Productivity and quality improvements should save €14,000 per year.
The team believe that the system will be used for THREE years.
Given that a payback period of 18 months or less is company policy, determine if the project should be undertaken. [10 marks]
Q4. Describe the operation of a Control system you are familiar with.
Your answer may contain, but is not limited to, information on the following topics: