Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

automatic railway gate control, Essays (university) of Reporting and Production

automatic railway gate control

Typology: Essays (university)

2018/2019

Uploaded on 10/14/2019

jaymeesh
jaymeesh 🇮🇳

5

(1)

1 document

1 / 63

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GUJARAT TECHNOLOGICAL UNIVERSITY
Chandkheda, Ahmedabad
Affiliated
Noble Group Of
Institutions,
Junagadh
A Project Report On
Automatic railway gate control system
Under subject of
DESIGN ENGINEERING 2A
B.E. Semester 5
(C.E. Engineering)
Submitted by Group:
Sr.
Name of student
Enrollment no.
1
Donga Jaymees
160350107012
Guided By:-
Prof. Shradhdha Bhalodiya
Head of The Department
Dr. Vipul M. Vekariya
Academic year
(2018-2019)
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f

Partial preview of the text

Download automatic railway gate control and more Essays (university) Reporting and Production in PDF only on Docsity!

GUJARAT TECHNOLOGICAL UNIVERSITY

Chandkheda, Ahmedabad

Affiliated

Noble Group Of

Institutions,

Junagadh

A Project Report On

Automatic railway gate control system

Under subject of

DESIGN ENGINEERING – 2A

B.E. Semester – 5

(C.E. Engineering)

Submitted by Group:

Sr. Name of student Enrollment no.

1 Donga Jaymees 160350107012

Guided By:-

Prof. Shradhdha Bhalodiya

Head of The Department

Dr. Vipul M. Vekariya

Academic year

II

DEPARTMENTAL CERTIFICATE

This is to certify that project work embodied in this semester entitled “ Automatic railway gate control system ” was carried out ”Jaymees’’ at Noble Engineering College, Junagadh (035) for partial fulfillment of Bachelor of Engineering degree to be awarded by Gujarat Technological University. This project work has been carried out under our guidance and supervision and it is our satisfaction.

Date:

Place:

Prof. Shradhdha Bhalodiya Dr. Vipul Vekariya C.E. Department C.S.E Department ( Internal Guide ) ( Head of the Department)

Seal of Institute

IV

ABSTRACT

The automatic railway gate control system provides different kinds of interactive man less to

control a railway gate.

Our purpose is to spread man less gate control idea amongst the world. So that people get attract and do railway manager which will help them build their empire of platform with coordination. To get source about ideas money, contacts etc. People who have better idea for men less gate control but no source of money to invest. They always want business partner. So we provide this platform to the world to do better man less gate control.

Our project is based on the same. Providing the automatic railway gate control system for the people with the great idea and give them a better the man less to control the gate.

Sr. TABLE OF CONTENT Page No. CERTIFICATE II ACKNOWLEDGEMENT ABSTRACT

III IV

1 INTRODUCTION 1 1.1 Design Thinking 1 1.2 It’s importance, Socio-Economical Relevance 1 1.3 Learning Tools and It’s Importance 1 2 EMPATHY MAPPING 3 2.1 Observation through AEIOU and other methods A 3 2.2 Role Playing 5 2.3 Interview Techniques 5 2.4 Mind Mapping (Data Analysis) 6 2.5 AEIOU Summary Framework 7 2.6 Empathy Mapping Canvas 7 3 IDEATION CANVAS 13

4 PRODUCT DEVELOPMENT CANVAS 19

5 CONCLUSION/FUTURE SCOPE 23 5.1 Advantages 23 5.2 Conclusion 23 6 PROTOTYPE 25 7 REFERENCE 26 V

2. AEIOU

 Observation through AEIOU and other

methods 

 Activities

  • Crying
  • Laughing
  • Buying
  • Eating
  • Listening
  • Transferring
  • Playing
  • Using
  • Running
  • Drinking

 Environment

  • Noise
  • Silent
  • Sad
  • Angry
  • Happy
  • cool

 users

  • Visitor
  • Traveler
  • T.C.
  • Railway manager

 Role Playing

Project idea is given by Donga Jaymees. AEIOU & PRODUCTION canvas prepared by Pritam Pansuriya. EMPATHIC & IDEATION canvas prepared by Ramani Parth. Report & mind mapping canvas prepared by us.

 Interview Techniques

 We collect the information through communicating with our end user. Like,

  1. Traveler
  2. Visitor
  3. Coolie
  4. Train staff
  5. T.C.

 AEIOU Summary framework 

 Empathy Mapping canvas 

Business coordination:  The process of organizing people or groups so that they work together properly and well it’s known as business coordination.

1) Users

  • Visitor
  • Traveler
  • T.C.
  • Railway manager

2) Stakeholders

  • Railway manager

3) Activities

  • Crying
  • Laughing
  • Buying
  • Eating
  • Listening
  • speaking

5) Empathy Mapping Canvas

 Conclusion from the empathy canvas

Conclusion for the Empathy Canvas is as follow:  From empathy canvas we got the knowledge about our users. Who are directly connected with our system in day to day life.  From empathy canvas we got the knowledge about stakeholders, the person who connected with our system directly or indirectly in their day today  From empathy canvas we got the activities about our users and how they use our system.  From empathy canvas we conclude that Farming is an important part of our life and we must try our best to improve it.

3. Ideation Canvas

 Problem Definition

There are various type of Iteration held together in our Ideation Canvas. In our Canvas there are many iteration showings different relationships between the different users and their activities which they usually perform under various Situation, context and Location by using various props. But sometime there are some problems arise when any of the relation does not work properly. Below are some various Iterations which we had observed in our Ideation Canvas  By Using this website students or employed person who have an idea but no source so it help to find investors.

There are several problems present in our Ideation Canvas and some of those problems are listed below:  No money to invest for their owner ideaNo business idea

Ideation Canvas

 People:-

  • Coolie
  • T.C.
  • Railway manager
  • Visitor
  • Traveler

Activities