Analysis of 1st Stage Tender Sum for Bovey Tracey Community Centre: Pre-construction, Study notes of Construction

A tender sum analysis for the construction of a new community centre in Bovey Tracey, prepared on behalf of the town council in February 2018. The analysis includes sections for pre-construction services, preliminaries, employers provisional sums, and construction cost estimate. the total values for each section and provides instructions for the contractor to submit detailed breakdowns of their proposed personnel and costs.

Typology: Study notes

2021/2022

Uploaded on 09/12/2022

virtualplayer
virtualplayer 🇬🇧

4.2

(12)

302 documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Chartered
Quantity
Surveyors
Project
Managers
Employers
Agents
CDM Consultants
1st Stage Tender Sum Analysis
New Community Centre
at
Bovey Tracey
On behalf of
Bovey Tracey Town Council
February 2018
pf3
pf4
pf5

Partial preview of the text

Download Analysis of 1st Stage Tender Sum for Bovey Tracey Community Centre: Pre-construction and more Study notes Construction in PDF only on Docsity!

Chartered Quantity Surveyors

Project Managers

Employers Agents CDM Consultants

st

Stage Tender Sum Analysis

New Community Centre

at

Bovey Tracey

On behalf of

Bovey Tracey Town Council

February 2018

1 st^ Stage Tender Sum Analysis

CONTENTS

GENERAL SUMMARY

SECTION A PRE-CONSTRUCTION SERVICES

SECTION B PRELIMINARIES

SECTION C EMPLOYERS PROVISIONAL SUMS

SECTION D CONSTRUCTION COST

Tender Sum Analysis

£ p

PRE-CONSTRUCTION SERVICES (REFER APPENDIX A)

The Contractor shall submit a detailed breakdown of his proposed personnel and costs for the Pre-Construction Services for the 2nd^ stage period in his preferred format.

Insert the Total Value below.

CARRIED TO GENERAL SUMMARY £

Tender Sum Analysis

£ p PRELIMINAIRES

The Contractor shall submit a detailed breakdown of his proposed Preliminaries in his preferred format, including a breakdown of fixed and time related elements.

Insert the Total Value below.

CARRIED TO GENERAL SUMMARY £

Tender Sum Analysis

£ p

CONSTRUCTION COST ESTIMATE

The Target (Construction) Cost for the proposed works (excluding Contractors Preliminaries, OH&P and Employers Provisional Sums) will be the sum of £750,000.

This Target Cost shall be verified during the second stage, prior to the commencement on site.

CARRIED TO GENERAL SUMMARY £